|
Specifications for Mechanical and Electrical Services
| File Name | ||
| filesNewTest.htm | ||
| electrical/ | ||
| Electrical Pre 3 1 06/ | ||
| Electrical Post 3 1 06/ | ||
| mechanical/ | ||
| Mechanical Post 3 1 06/ | ||
| Mechanical Pre 3 1 06/ | ||
| Mechanical _Pre_3_1_06/ | ||
Note Post 3-1-06 specifications should be used for projects where the RFQ for A/E selection is released on or after 3-1-06. These specs utilize new master format 2004 Division Numbering. Pre 3-1-06 specifications should be used for projects where the RFQ for A/E selection is released before 3-1-06. These specs utilize Division 15 and 16 Numbering. |