U.T. Austin Experimental Science Building (102-259) |
|
|
|
|
|
Affiliation |
Contact Name |
Contact Number |
E-mail Address |
|
|
|
|
The Beck Group |
Matt Pickens
Project Manager |
512-524-1480 |
mattpickens@beckgroup.com |
OHD&FSBP |
Orlando Castaneda
HUB/Technical Assistance Coordinator |
512-499-4631 |
ocastaneda@utsystem.edu |
|
|
|
|
|
|
|
|
|
|
Bid Package #2 – (demo & abatement, ductbank, thermal utilities , CWR bore) |
1/4/08 - Advertise RFP for selection of Pack 2 trade contractors |
1/9/08 – Pre-Proposal meeting - Pack 2 trade contractors |
1/21/08 – Pre-Proposal deadline - Pack 2 trade contractors |
1/29/08 - NTP - Pack 2 trade contractors |
|
Bid Package #2A – (excavation & retention system) |
02/21/08 - Advertise RFP for selection of pack #2a trade contractors |
02/27/08 – Pre-Proposal meeting - Pack #2a trade contractors |
03/05/08 – Pre-Proposal deadline - Pack #2a trade contractors |
05/15/08 - NTP - Pack #2a trade contractors |
|
*The plans and specifications for Pack 2 are the same plans and specifications being utilized for Pack 2a. |
|
Bid Package #3 – (foundation & remaining utilities) |
|
- Mixer/Outreach for pack #3 trade contractors |
Estimated in |
- Advertise RFP for selection of Pack #3 trade contractors |
June |
- Pre-Proposal meeting - Pack #3 trade contractors |
|
- Proposal deadline - Pack #3 trade contractors |
|
- NTP - Pack #3 trade contractors |
|
Bid Package #4 – (exterior & interior build-out) |
|
- Mixer/Outreach for Pack #4 trade contractors |
Estimated In |
- Advertise RFP for selection of Pack #4 trade contractors |
August |
- Pre-Proposal meeting - Pack #4 trade contractors |
|
- Proposal deadline - Pack #4 trade contractors |
|
- NTP - Pack #4 trade contractors |
|
***These dates are projected dates and are subject to change. Please contact one of the individuals above to verify actual dates. |
U.T. Health Science Center San Antonio South Texas Research Facility (402-275) |
|
|
|
|
Affiliation |
Contact Name |
Contact Number |
E-mail Address |
| |
|
|
|
Vaughn Construction |
Brett Fairman Project Manager |
210-558-9494 |
bfairman@vaughnconstruction.com |
OHD&FSBP |
Orlando Castaneda
HUB/TA Coordinator |
512-499-4631 |
ocastaneda@utsystem.edu
|
|
|
|
|
Bid Package #1 – (excavation. site utilities, piers, vivarium structure and parking lots) |
To Be Determined – Mixer/outreach for pack #1 trade contractors |
05/07/08 – Advertise RFP for selection of pack #1 trade contractors |
05/15/08 – Pre-Proposal meeting – pack #1 trade contractors |
05/27/08 – Pre-Proposal deadline – pack #1 trade contractors |
06/10/08 – NTP – Pack #1 trade contractors |
|
Bid Package #2 – (main bldg. slab/structure, curtain walls, and central plant 100%) |
To be determined – Mixer/Outreach for pack #2 trade contractors |
07/15/08 – Advertise RFP for selection of pack #2 trade contractors |
07/23/08 – Pre-proposal meeting – pack #2 trade contractors |
08/07/08 – Proposal deadline – pack #2 trade contractors |
08/28/08 – NTP – pack #2 trade contractors |
|
Bid Package #3 – (exterior skin) |
To be determined – Mixer/Outreach for Pack #3 trade contractors |
TBD – Advertise RFP for selection of pack 3 trade contractors |
TBD – Pre-proposal meeting – pack #3 trade contractors |
TBD – Proposal deadline – pack #3 trade contractors |
TBD – NTP – pack #3 trade contractors |
|
Bid Package #4 – (MEP and interior build-out main bldg. and vivarium) |
TBD – Mixer/Outreach for pack #4 trade contractors |
11/21/08 – Advertise RFP for selection of pack #4 trade contractors |
12/01/08 – Pre-proposal meeting – pack #4 trade contractors |
12/17/08 – Proposal deadline – pack #4 trade contractors |
01/14/09 – NTP – pack #4 trade contractors |
|
***These dates are projected dates and are subject to change. Please contact one of the individuals above to verify actual dates. |
The University of Texas Biomedical Engineering Building (102-172) |
|
|
|
|
Affiliation |
Contact Name |
Contact Number |
E-mail Address |
|
|
|
|
Vaughn Construction |
Art Serna, Jr.
Project Manager |
512-475-8119 |
artjr@vaughnconstruction.com |
Vaughn Construction |
Erik Eubank
Assistant Project Manager |
512-475-8119 |
eeubank@vaughnconstruction.com |
OHD&FSBP |
Shaun McGowan
HUB Coordinator |
512-499-4634 |
smcgowan@utsystem.edu |
|
|
|
|
|
|
|
|
Bid Package #1 – (Utilities/Excavation/Foundations)) |
08/31/08 - Mixer/outreach for pack #1 trade contractors |
09/01/08 – Advertise RFP for selection of pack #1 trade contractors |
09/15/08 – Pre-Proposal meeting – pack #1 trade contractors |
09/26/08 – Proposal deadline – pack #1 trade contractors |
|
Bid Package #2 – (Building Structures/Exterior/Interior Build-Out) |
12/19/08 – Mixer/Outreach for pack #2 trade contractors |
12/22/08 – Advertise RFP for selection of pack #2 trade contractors |
01/05/09 – Pre-proposal meeting – pack #2 trade contractors |
01/16/09 – Proposal deadline – pack #2 trade contractors |
|
***These dates are projected dates and are subject to change. Please contact one of the individuals above to verify actual dates. |
UT Austin School of Nursing Addition (102-198-1) |
| |
|
|
|
Affiliation |
Contact Name/Title |
Contact No. |
E-Mail Address |
| |
|
|
|
| Harvey-Cleary Builders |
Clint Morris
Project Manager |
512.928.9300 |
|
| OFPC- HUB |
Justin Jones
HUB Coordinator |
512.499.4606 |
|
|
|
|
|
|
|
|
|
|
|
| Pack 1 Bid Package - (Fire Protection Code Upgrades) |
| - Advertise RFP for selection of tree removal |
| - PreProposal Meeting for above trade contractors |
| - PreProposal Deadline for above trade contractors |
| |
| Pack 2 Bid Package - (Steel, Curtainwall, Demo, Concrete) |
| 4/21/08 - Advertise RFP for selection of Pack 2 trade contractors |
| 4/23/08 - PreProposal Meeting - Pack 2 trade contractors |
| 5/6/08 - PreProposal Deadline - Pack 2 trade contractors |
| |
| Pack 3 Bid Package - (Interior Build-Out, MEP) |
| *5/9/08 - Mixer/Outreach for Pack 3 trade contractors |
| *5/12/08 - Advertise RFP for selection of Pack 3 trade contractors |
| *5/14/08 - PreProposal Meeting - Pack 3 trade contractors |
| *5/26/08 - Proposal Deadline - Pack 3 trade contractors |
|
|
|
|
|
|
|
|
|
|
|
|
| *These dates are projected dates and are subject to change. Please contact one of the individuals above to verify actual dates. |
UT Administration Building Renovation (102-346) |
|
|
|
|
Affiliation |
Contact Name/Title |
Contact No. |
E-mail Address |
|
|
|
|
Flintco, Inc. |
Toby Smith
Project Manager |
512-891-7224 |
tsmith@flintco.com |
OFPC – HUB |
Stephanie Park
HUB Coordinator |
512-499-4378 |
spark@utsystem.edu |
|
|
|
|
|
|
|
|
Bid Package #2 – Generator |
04/03/08 – Advertise RFP for selection of pack #2 trade contractors |
04/10/08 - Pre-Bid Conference |
04/24/08 – Bids Due |
|
Bid Package #3 – MCC, Pumps and Chillers |
04/17/08 – Advertise RFP for selection of pack #3 trade contractors |
04/23/08 – Pre-Bid Conference |
05/08/08 – Bids Due |
|
Bid Package #4 – OFPC Finish-Out (Floors 6 & 7) |
05/12/08 – Mixer Outreach for Pack #4 contractors |
05/20/08 – Advertise RFP for selection of pack #4 trade contractors |
05/28/08 - Pre-Bid Conference, 2:00 p.m. (Tentative) |
06/10/08 – Bids Due |
|
Bid Package #5 – Infrastructure/Core, I-School Finish-Out (Floors 5 & 1) |
07/08/08 – Advertise RFP for selection of pack #5 trade contractors |
07/09/08 - Pre-Bid Conference, 2:00 p.m. (Tentative) |
07/29/08 – Bids Due |
| |
| *These dates are projected dates and are subject to change. Please contact one of the individuals above to verify actual dates |
Bid Package #4 - Proposal Request
(UT Administration Building Renovations)
Project Information:
Project Name: UT Austin – UT Administration Building Renovations
Project Location: Austin, Texas
Submit Proposal pricing by: 6/10/08 @ 2:00 PM
Project Description:
Flintco is the CM @ Risk on this project. The project includes the renovation on an existing 8
floor, 253,000 SF building @ 1616 Guadalupe Street. The finish out of floors 6 & 7 scope for
this Bid Package #4 will include the following packages : Final Cleaning, Masonry, Misc. Metals,
Millwork/Running Trim/Casework, Doors/Frames/Hardware, Glazing, Drywall / ACT systems,
Carpet/VCT, Ceramic Tile, Painting, Demountable partitions, Specialties, Signage,
Mechanical/Plumbing and Electrical / Fire Alarm / Telecomm / Security.
Project Schedule:
The schedule for BP #4 includes an anticipated Start of July 2008 and Completion of Nov. 2008.
Pre-Bid, Site Visit:
There will be a pre-proposal meeting on 5/29/08 @ 2:00 PM, at 1616 Guadalupe St, Austin, TX
in the 1st Floor. Pay parking is available in the parking garage on the west side of the Building.
Attendance is STRONGLY ENCOURGAGED for all companies interested in proposing on the
project. This will be the only time for a guided tour of the building and to visit the site and become familiar with the existing job conditions, site access and to discuss project expectations with the
CM and the design team.
Plans Availability:
Planrooms: iSqFt, ABC, AGC, Dodge, Builder’s Exchange, City of Austin Department of Small
Minority, and Austin Black Contractor’s Association.
Plans will also be available on 5/20/08 at Flintco’s Austin, Texas office. Please contact Justin
Weaver or Mike Hutter for availability prior to picking up.
Documents will be available in either electronic version (CD), hard copy (paper) plans.
You may also view them at our office located at: 5316 Hwy 290 West, Suite 480, Austin, TX
78735. (Please call for an appointment prior to coming.)