Our OneUTSystem site provides information and updates on the new UT System Administration office building now under construction. Operations from five antiquated buildings will be consolidated into the new 19-story, 330,000 SF building, resulting in reduced maintenance and operating expenses and greater efficiencies.

Take a virtual “hard hat tour” of the new building with Project Manager Bart Kleiman through a series of videos, each focused on a different area or feature. The videos, shot by Senior Video Production Coordinator Charlie Palafox (Office of External Relations), will be updated regularly throughout the construction process to provide a glimpse of what it will be like working and visiting there.

Click here to view the videos.

Click here to view a video illustrating the financial benefits associated with the new building.

Click here to view video instructions getting into and out of our new parking garage.

The new UT System building is SO close to completion! The number of tests and inspections are keeping the entire team extremely busy. All of these tests and inspections will ensure that a well-built, safe, and secure building is handed over on July 12th when the keys will be symbolically transferred to Facilities Management for building operation. What an exciting time at UT System! Here are a few more photos.

Late night view from 7th and Lavaca. Main building sign is set on one of the preset colors. The Commons balcony is lit up. Similar to the main sign the color of lighting for the Commons can be changed.
Late night view from 7th and Lavaca. Main building sign is set on one of the preset colors. The Commons balcony is lit up. Similar to the main sign the color of lighting for the Commons can be changed.

 

Early morning photo from 7th and Colorado. The traffic control fence has been removed! The Littlefield doors can be seen under the main building sign.
Early morning photo from 7th and Colorado. The traffic control fence has been removed! The Littlefield doors can be seen under the main building sign.

Flag poles/UFCU Space
Flag poles are on the left. UFCU space is on the first floor on the left. Multi-Function Room is on the 2nd floor above UFCU. UT System seal and Institution names are underneath the entry canopy. Main entry doors are in the bottom center of photo. 2nd story lobby and entry stairs are to the right.
Institutional signage
Signage contractor is installing the Institution names on the basalt wall at the building entry.
Lite stairs
One of the life safety code requirements implemented in the building is the installation of photo-luminescent markings in the exit stairs. These markings are installed to maintain a sense of direction in the case of loss of power and loss of generator power.
Unlit stairs
Stairs without lighting. Although it is interesting, the hope is that this condition is never seen because it would indicate a double power failure.
Downtown view from Commons
View from the Commons balcony during an evening of building systems testing.